WSUD Renewals, Cranbourne

Project Information

Location: Cranbourne
Client: City of Casey
Service Category: Drainage & Open Spaces
Duration: 3 weeks

Project Overview

APS Civil was engaged by the City of Casey to carry out renewal and remediation works on two water sensitive urban design assets in Cranbourne, at Olympus Crescent and Eros Crescent. Both are bioretention and sediment ponds sitting in open space surrounded by housing, so the work needed to be managed carefully around residents and everyday public access.

The existing biofilter media had reached the end of its serviceable life and needed to be stripped out and replaced to bring the systems back to their design function. Alongside the media renewal, the ponds required drainage inlet works, replanting and full reinstatement of the surrounding areas.

Scope of Works

  • Liaison with relevant authorities ahead of works commencing
  • Site establishment and securing of the work areas within public open space
  • Water management, including control of levels and flows through the pond system for the duration of the works
  • Scraping out and removal of existing biofilter media
  • Resetting of the drainage inlet
  • Supply and installation of new biofilter media
  • Planting of designated areas within the basins
  • Reinstatement of all disturbed areas

Challenges

Both sites are live stormwater assets, which meant water levels had to be actively managed throughout. Rainfall during the works period lifted levels in the ponds and slowed progress, and the crew worked in consistently wet ground while trying to strip and replace media, reset the inlet and reinstate surfaces. Sequencing the works around the weather was the main constraint, particularly getting reinstatement and planting done in conditions that were not ideal for it.

Working in established residential open space also meant keeping the sites secure and tidy, with pedestrian paths and neighbouring properties immediately adjacent.

Outcome

Both bioretention systems were completed and are functioning as designed. New biofilter media is in place, the drainage inlets have been reset, planting has been established in the designated zones and all disturbed areas have been reinstated and handed back to the City of Casey.